Repair Procedures: Replacement
- Shut off the high voltage circuit.
(Refer to Automatic Transaxle System - "HIGH VOLTAGE SHUTOFF PROCEDURE ")
- Remove the under cover.
(Refer to Engine Mechanical System - "ENGINE ROOM UNDER COVER ")
- Drain the coolant of hybrid motor cooling system.
(Refer to Hybrid Motor System - "COOLANT ")
- Remove the ATF drain plug (A), allow the fluid to drain out and then reinstall the drain plug.
Tightening Torque:
33.3 - 43.1 N.m (3.4 - 4.4 kgf.m, 24.6 - 31.8 lb.ft)
NOTE: The existing ATF drain plug gasket must be replaced with a new one. (Do not reuse it.) - Remove the air cleaner assembly and air duct.
(Refer to Engine Mechanical System - "AIR CLEANER ")
- Remove the hybrid power control unit (HPCU) assembly.
(Refer to Hybrid Control System - "HYBRID POWER CONTROL UNIT "
- Add 5 liters of ATF SP-IV through the ATF filler hole after removing the eyebolt (A).
- Perform the ATF level check procedure.
(Refer to Fluid - "INSPECTION ")