Installation Procedure
- Install the CD player to the console till the tabs locks in place.
- Place the bezel to the console.
- Connect the electrical connectors.
- Install the bezel to the console by pushing on the corners till the retainers clicks in place.
- Install the I/P cluster bezel. Refer to BEZEL REPLACEMENT - INSTRUMENT PANEL (I/P) CLUSTER in Instrument Panel, Gages and Console.